Skip to main content
Logo Ports de Balears
EN
  • CA
  • ES
  • DE
  • Corporate information
    • Welcome
    • About us
    • News
    • CSR
    • Tranparency
    • Where we are-Location
  • APB Ports
    • Introduction
    • Alcúdia
    • Ibiza
    • Maó
    • Palma
    • La Savina
  • Traffic
    • Ships in Port
    • Statistics
  • Innovation
    • Information on Innovation
    • Projects
    • Calls
  • e-Office
    • Home
    • Schedule an appointment
    • Procedures Catalog
  • Navigation services
    • Balearic Island lighthouses
    • Navigational aids
    • Oceanography
  • Regulations
    • Primary legislation
    • APB ordinances
    • Other APB regulations
    • Plans
      • Port of Alcudia
      • Port of Ibiza
      • Port of Mahon
      • Port of Palma
      • Port of la Savina
  • Library
    • Documents
    • Photographic library
    • Video library
    • Publications
  • Welcome
  • About us
  • News
  • CSR
  • Tranparency
  • Where we are-Location
  1. /Home
  2. /News APB
Fondo cabecera

News APB

 

THE APB AND STP ORGANISE AN INFORMATIVE DAY ON HEALTH AND SAFETY AT WORK AIMED AT VESSEL REPAIR AND MAINTENANCE WORKERS

31/01/2019

THE APB ACQUIRES 4 HYBRID ELECTRIC VEHICLES AND TENDERS FOR A FURTHER 5 ADDITIONAL 100% ELECTRIC VEHICLES

29/01/2019

THE APB TENDERS THE WORK FOR STRENGTHENING THE WHARF OF DOCK OF BOTAFOC IN THE PORT OF IBIZA

29/01/2019

THE APB AWARDS ACCIONA CONSTRUCCIÓN A CONTRACT FOR THE UPGRADING AND IMPROVEMENT WORKS OF THE FLOATING DOCK AT THE CÓS NOU WHARF AND FOR THE DRY DOCK RAMPS AT THE PORT OF MAHON

17/01/2019

Completion of the Mola Lighthouse works of the Formentera Council

17/01/2019

THE PORT AUTHORITY OF THE BALEARIC ISLANDS IS TO EXTEND PEDESTRIAN ACCESS FROM THE PROMENADE TO THE HARBOUR STATION AT THE PORT OF ALCUDIA

16/01/2019

A LENS LOCATION CHANGE DUE TO IMPROVEMENT WORKS IN THE PERMANENT MARITIME SIGNALLING EXHIBITION AT PORTOPÍ

11/01/2019

THE PORT OF MAHON INSTALLS A DRAINAGE SYSTEM AND A NEW SEWAGE NETWORK FOR DEALING WITH RAIN WATER AND WASTE WATER IN THE DOCKS OF COS NOU

08/01/2019

THE APB PUTS OUT TO TENDER A CONTRACT TO MANAGE MOORINGS AND COMMERCIAL PREMISES IN BOTAFOC HARBOUR STATION AT THE PORT OF IBIZA

18/12/2018

THE APB TO AWARD A CONTRACT TO DESARROLLOS CONCESIONALES INSULARES S.L. TO MANAGE THE SMALL BOAT DOCK AT THE PORT OF LA SAVINA

18/12/2018

THE APB TO AWARD CONCESSION TO MAHON MARITIME CLUB TO MANAGE THE MOORINGS AT THE D'EN REYNÉS BOATYARD IN THE LEVANTE DOCK AT THE PORT OF MAHON

18/12/2018

THE PORT AUTHORITY OF THE BALEARIC ISLANDS SIGNS THE PROTOCOL WITH THE REGIONAL GOVERNMENT, THE ISLAND COUNCIL AND THE TOWN COUNCIL OF IBIZA FOR THE CREATION OF THE SEA AND FISHING MUSEUM OF IBIZA

12/12/2018
  • First page « Primero
  • Previous page ‹ Anterior
  • …
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • …
  • Next page Siguiente >
  • Last page Último »
Logo Gobierno de España. Ministerio de Transportes y Movilidad Sotenible. Logo ports de balears
Sello Aenor. Gestión de la Calidad, norma ISO 9001. Sello Aenor. Gestión Ambiental, norma ISO 14001. Sello Aenor. Gestión de Documentos, norma ISO 30301. Esquema Nacional de Seguridad (ENS), con certificación de conformidad en Categoría Media, según el Real Decreto 311/2022.
  • Tel.: 971 22 81 50. Fax: 971 72 69 48.
  • Moll Vell, 3-5. 07012 Palma
  • portsdebalears@portsdebalears.com
Copyright © 2022 - 
  • Disclaimer | 
  • Privacy policy | 
  • Cookie Policy | 
  • Accesibilidad de la web