Pedestrian walkway for Dique del Oeste, Port of Palma
12/05/2008
The PAB will shortly begin improvements on the pedestrian walkway on the exterior breakwater of the Dique del Oeste. This project, valued at 300 thousand euros, involves reforming 800 metres of the breakwater and providing it with a suitable lighting system designed to minimize light pollution. Access will be open to the public, except when it is considered dangerous due to sea conditions. The installation will take two months to complete and will begin in approximately one month