The Board of Directors of the Port Authority of the Balearic Islands (APB) resolved, this Wednesday 29 March in an ordinary session, to choose the proposal submitted by the company Calima la Savina

Construction work on the Poniente docks in the Port of Alcudia has been completed. The project consisted of expanding the esplanade toward the northwest and gaining approximately 27,500 square meters of surface area over water. It will give the docks a new line of dockage, with five meters draught, for regular passenger and freight traffic, as well as a pier for local traffic and includes the necessary dredging operations of the new access channel. The project carried out by U.T.E. Dragados and Llabrés Feliu, contemplated the area of the esplanade, which in effect will become a functional extension of the existing one, to be considered for commercial use, intended primarily as a parking facility for semi- trailers and other ro-ro traffic. The dredging work included both the trench for the foundation of the docks, as well as the entry channel to them. On the dredging platforms, in the area of the docks, a supporting structure was installed in order to achieve a better distribution of tensions above ground. Above it, the concrete dock wall was constructed. The work was completed in the estimated time and the final budget came to approximately six million euros
The Board of Directors of the Port Authority of the Balearic Islands (APB) resolved, this Wednesday 29 March in an ordinary session, to choose the proposal submitted by the company Calima la Savina
The Board of Directors of the Port Authority of the Balearic Islands (APB) has approved the text of the agreement for the management of spaces and facilities at the Portocolom lighthouse in Mallorc
This morning, firefighters from the Consell Insular de Menorca (CIME) and the Port Authority of the Balearic Islands (APB) took part in a simulated terrorist attack on board a ship in the port of M
Since yesterday, visitors strolling through the port of Maó will be able to refill their water bottles thanks to the installation of a filtered water fountain financed by Menorca Preservation, the
Transforming ports into agents of environmental regeneration and the fight against climate change is the objective of the OASIS project, developed by the Spanish company Ocean Ecostructures and whi
Una exposició de National Geographic.